12 Jan 2015 : While doing regular timing of Vela during the UTMOST commissioning, PhD student Fabian Jankowski has detected a glitch in the pulsar’s slow down rate.
- Our ATEL telegram of the glitch is here.
12 Jan 2015 : While doing regular timing of Vela during the UTMOST commissioning, PhD student Fabian Jankowski has detected a glitch in the pulsar’s slow down rate.
1 thought on “Glitch in Vela pulsar detected at Molonglo”
Comments are closed.